Modification mapping doesn’t end when construction crews leave the site — verifying that the work matches the engineering is just as important after the modification is complete as it is while the work is underway. During construction, our team maps progress in real time, confirming that each phase of the modification is being installed correctly and matches the approved plans. Once the project is finished, we perform a post-modification mapping to document the final as-built condition and verify that everything was completed in accordance with the design.
This combined approach catches issues while they’re still easy to correct and then provides a final, documented confirmation that the structure was built as designed. The result is a clear as-built record that reflects the true condition of the structure after modification — information that’s essential for future inspections, additional modifications, or ongoing structural analysis.